Skip to main content
Browse Collections
Collection Tree
About
San Joaquin Valley Library System Digital Collections
Search
Browse Items (6272 total)
Browse All
Browse by Tag
Search Items
Previous Page
of 628
Next Page
Sort by:
Title
Creator
Date Added
Millerton
A view of Millerton.
Pine Flat Dam Construction view from above
A view from above the construction showing the work at the top from end to end.
Pine Flat Dam Construction
A view of the dam as it was being built.
Pine Flat Dam- Kings River, Fresno County, CA
A view of the construction of the Pine Flat Dam taken March 15, 1952.
Pine Flat Dam Construction Metal Workings
Two men standing looking out over the metal workings of the dam.
Last of Concrete Placed at Pine Flat Dam.
Group of men pouring the last of the concrete into Pine Flat Dam.
Pine Flat Dam Construction
Another view of the Pine Flat Dam Construction, likely after finishing concrete work, 1953.
A View of Pine Flat Dam During Construction.
A view of Pine Flat Dam during construction probably close to 1953, not quite finished pouring the concrete.
First Bucket of Concrete Placed in Pine Flat Dam.
Group of men watching the first bucket of concrete being placed in Pine Flat Dam on November 1, 1950. The U.S. Army Corps of Engineers Sacramento District was overseeing the project.
Pine Flat Dam - During construction
A view of the dam during construction between 1950-1953.
Previous Page
of 628
Next Page
Output Formats
atom
,
csv
,
dcmes-xml
,
json
,
omeka-xml
,
rss2