Browse Items (6234 total)

frg0008a.jpg
A view of Millerton.

frg0009a.jpg
A view from above the construction showing the work at the top from end to end.

frg0010a.jpg
A view of the dam as it was being built.

frg0011a.jpg
A view of the construction of the Pine Flat Dam taken March 15, 1952.

frg0012a.jpg
Two men standing looking out over the metal workings of the dam.

frg0013a.jpg
Group of men pouring the last of the concrete into Pine Flat Dam.

frg0014a.jpg
Another view of the Pine Flat Dam Construction, likely after finishing concrete work, 1953.

frg0015a.jpg
A view of Pine Flat Dam during construction probably close to 1953, not quite finished pouring the concrete.

frg0016a.jpg
Group of men watching the first bucket of concrete being placed in Pine Flat Dam on November 1, 1950. The U.S. Army Corps of Engineers Sacramento District was overseeing the project.

frg0017a.jpg
A view of the dam during construction between 1950-1953.
Output Formats

atom, csv, dcmes-xml, json, omeka-xml, rss2